India

H3N2 outbreak: Puducherry schools will remain shut from March 16-26

Published

on

  • Write technical materials, such as equipment manuals, appendices, or operating and maintenance instructions. May assist in layout work.
  • Participate in technical reviews, working group meetings, Integrated Planning Team (IPT) sessions, and other technical meetings as required.
  • Provide inputs to the development of design and implementation plans for VTC networks and integrated AV systems. All engineering inputs will be provided in a timely manner, neatly prepared, comprehensive and accurate. 
  • Provide AV-related inputs to the development of various documents, plans and briefings including: site and equipment surveys, scheduling plans, work breakdown structures, and engineering briefings/analysis.
  • Provide AV-related inputs to the development of Naval Surface Warfare Center, Port Hueneme Division compliant SOPs including elements such as block diagrams, wiring diagrams, cabling diagrams, signal flow diagram, and other miscellaneous details, drawings and diagrams.

Group Media Publications
General News Platform – https://ihtlive.com/
Entertainment News Platforms – anyflix.in 
Construction Infrastructure and Mining News Platform – https://cimreviews.com/
Podcast Platforms – https://anyfm.in

Trending

Exit mobile version